Djagble Kitchen
A kitchen reconfigured to maximise vertical storage while preserving natural light, with an elegant composition in eucalyptus green and teak.
Project snapshot
Client need & context
The kitchen lacked sufficient upper storage, despite benefiting from a generous opening that brought in abundant natural light. The challenge was to substantially increase storage capacity while preserving this brightness, which was essential to the comfort and spatial quality of the room.
Constraints that shaped the project
- •Absence of upper cabinets
- •Strong need for increased storage
- •Presence of a large, structuring window
- •Essential preservation of natural light
Editorial note — Key decision
- ▸Recomposition of the internal elevation around the window
- ▸Recentring of the opening to free up lateral storage zones
- ▸Installation of upper cabinetry integrated into the new composition
- ▸Preservation of a generous and balanced flow of daylight
What was included
Furniture & fittings
A complete modular kitchen reimagined to maximise vertical storage while preserving the architectural balance of the room. The composition incorporated wall and base units in Eucalyptus Green, paired with a solid teak wood worktop, bringing depth, warmth, and elegance to a project in which functionality and natural light needed to coexist with precision.
Appliances supplied
Project manager coordination
Project coordination made it possible to orchestrate with precision the interventions related to the reconfiguration of the internal elevation and the installation of the cabinetry. Site measurements, layout validation, team supervision, alignment control, and on-site adjustments ensured a smooth execution and a final result faithful to the project’s ambition: more storage, without compromise to light or aesthetics.
Trades involved
plombier, électricien, installateur
How this project was coordinated
Modular furniture specified and a vetted project manager matched to the brief.
Independent PM sequences and oversees all trades across the programme.
Each professional works independently on agreed timelines.
Furniture, handling fee, and trade invoices issued separately by each party.
Budget breakdown
Figures reflect delivered project costs, rounded for clarity and privacy.
Appliances shown only when supplied by us. Services reflect trades we coordinated — any trades the client arranged independently are not included here. Final costs vary based on scope, site conditions, and selected finishes.
Timeline
16 weeksTimelines may vary based on trade availability and site conditions.
What this project revealed
The performance of a kitchen often lies in the dialogue between architecture and joinery. By reworking the wall composition rather than setting storage and light in opposition, the project achieved a rare balance between enhanced functionality and preserved spatial quality.
Related projects
Browse similar projects for budget and scope comparison.
Considering a kitchen like this?
We can walk you through the same planning steps and coordination approach used here. No obligation.
Serving Lomé (Togo) and Cotonou (Benin) • Typical callback response: within 1 business day



